A a number of-month rework mission in 18 minutes, the place an outdated underutilized constructing is transformed into a kitchen. I filmed the complete rework course of beginning with unloading the constructing supplies, and displaying every thing from placing up partitions to constructing an prolonged roof. The builders have been nice about permitting me to movie the complete course of!
This video was created in 4K at 60fps with over 200 hours of time lapse footage totaling over 150gb, and brought with 2 GoPro cameras, so it’s my largest video mission to this point.
Time Stamps:
0:00 Intro sequence (earlier than rework)
0:05 Removing the final of our stuff earlier than work begins
0:17 Delivery of constructing supplies
0:22 Remodel begins; tearout of wall panels and insulation
0:52 Moving and re-framing wall with doorway
1:09 Cleanup of some scrap supplies
1:12 Pressure washing the ground
1:28 Removing remaining wall panels
1:32 Installing new electrical breaker field
1:44 Removal of wall insulation and ceiling panels
2:20 Framing new finish wall
3:05 Window set up in again wall
3:15 Installing extra studs in again wall
3:24 Front step to the lavatory
3:31 Removing outdated broken electrical wiring
3:40 Installation of latest electrical and web wiring
4:05 Installing heater/AC unit
4:17 Placing help posts for brand spanking new roof extension
4:35 Bathroom ground
4:55 Framing entrance wall
5:00 Framing toilet
5:25 Installing OSB panels to toilet and entrance wall
5:47 Setting roof help beams
5:52 Gravel for entrance patio space
6:08 Interior ceiling panels set up
6:23 Insulating again wall
6:39 Bringing in stack of OSB out of the rain
6:43 Insulating again wall
6:52 Insulating aspect partitions
7:07 Moisture barrier on again wall
7:22 Bottom strip of OSB panels put in
7:28 Cutting electrical field holes in 2nd row of OSB panels
7:41 Finishing the again wall
7:48 Side wall
8:06 Other aspect wall
8:11 Light wiring and insulation
8:33 Water pipe set up
8:39 Attaching OSB ceiling boards
9:00 More framing and altering out lights
9:07 Finishing the insulation and ceiling boards
9:52 Finishing the aspect partitions
9:58 Support beams for the brand new roof
10:21 Securing wooden with rebar
10:26 Finishing roof helps
10:31 Plastic moisture barrier for roof
10:42 Installing sheet metallic on roof
11:04 Attaching tar paper to partitions
11:22 Front wall moisture barrier
11:31 Setting up door frames
11:45 Small dividing wall and light-weight change
11:54 Bathroom gentle/heater wiring
12:00 Bathroom insulation
12:07 Bathroom wall and ceiling panels set up
12:45 Front wall OSB panels
12:51 Gluing vinyl ground in toilet
13:05 Front wall OSB panels
13:17 Preparing to color, emptying room
13:32 Room is painted (spray paint so could not movie)
13:37 Painting the ground
14:00 New ceiling lights put in
14:15 Ceiling followers put in
14:25 Finishing entrance wall
14:28 Bathroom dividing wall
14:38 Installing outlet covers
14:45 Building shelf within the nook
15:04 Front door put in
15:11 Deciding which kitchen cupboards to make use of
15:35 Bringing in washer/dryer and stoves from our storage constructing
15:40 Bringing in 5 fridges/freezers
16:02 Nailing trim wooden to wall (for aesthetics)
16:46 Trim wooden for ceiling
17:08 Installing an extra set of cupboards above fridges
17:16 Hooking up dishwasher
17:21 Attaching counter tops to the cupboards
17:26 Sink set up
17:36 Propane gasoline line
17:48 Final outside sheet metallic panels
17:58 Kitchen is completed!